The project involved replacing a number of aging dwellings with 56 flats and 7 two-bedroom bungalows, as well as constructing new access roads, to provide Independent living for the local people. Modern, high quality housing as well as a community lounge and administration offices make up the complex, providing a safe and long lasting environment.
Case Studies
The Bell Tower, Brackley, Northants
Site visit with Engineer, Architect and client enabled initial ideas to be discussed, as well as constraints of the historic buildings to be assessed.
Ashby’s Yard, Tonbridge, Kent
Construction of 92 residential units of varying sizes utilising sustainable technologies and materials whilst maximising natural features and incorporating the riverside route through to Medway Wharf.
Tesco, Ramsey
“Enviro Store” – first UK Zero carbon store with sustainable materials CHP and innovative design with timber framing.
Newington Butts, London
Development of former London Park Hotel site at Elephant and Castle for new 44 storey tower block with Southwark Playhouse facility at basement and ground floor and residential apartments above.
Jury’s Inn, New Hotel, Plymouth
This mixed-use scheme comprises a 247 bedroom Jury’s Inn 3* Hotel with 5,000sq ft leisure, bar or restaurant space, 64 apartments, 25 car parking spaces.
Hertford Regional College: Broxbourne
As part of a £63m upgrade of the college’s facilities, three new buildings were constructed and alterations carried out to three others .
Mental Health Unit, Harperbury
The project created a split-level mental health unit within the grounds of other existing health buildings.
Fal Building, Truro College
The Fal Building is a landmark that marks the entrance to the city of Truro. It is a rhomboid on plan to suit the available site.
Dunraven School, London – Sports Hall
Designed and built in only three months using recycled shipping containers to create 8,208 m3 of space providing a 4 court sports hall, viewing gallery, changing rooms and office across two floors.
C4C Care Home, Croydon
The project consisted of the phased construction of 4 new care home buildings, three were specialist care homes and the fourth was an extra care facility. Two of the homes have also incorporated day centres.